Steven Brickner Tampa crestSteven BricknerTAMPA · FLORIDA

TAMPA · RESIDENTIAL DESIGN DEVELOPMENT

A home shaped
around daily life.

A floor plan begins to make sense when you trace an ordinary day through it. The Tampa ground-up concept explores arrival, privacy, service access and outdoor living while retaining the existing pool.

Concept and planning stage. Layouts, dimensions and construction scope remain subject to survey, elevation requirements, design, engineering and permitting.

Five suites, with privacy built in

The brief places the primary suite and one guest suite downstairs, with three ensuite bedrooms upstairs. An upstairs media/lounge and gym share space, while an office and open formal areas remain part of the main-level program.

Garages that support the plan

The preferred arrangement uses two two-car garages brought forward toward the street, with living spaces behind them. Each garage is targeted at 24 feet wide and 28 feet deep, with 23 feet of width considered only if needed. Garage entries should connect through practical service or circulation areas rather than formal rooms or the primary suite.

Let the pool guide outdoor access

The existing pool stays. The pool bath belongs at the rear with direct exterior access, so swimmers do not need to pass through a bedroom or walk through the home. Covered outdoor living and the relationship between the kitchen, guest suite and pool are part of the same circulation problem.

Give service spaces a purpose

The kitchen, pantry, butler’s pantry and dining area need workable connections. Laundry and mudroom space should support garage arrival while protecting the living areas. Upstairs laundry and linen storage should fit the program without creating unnecessary hallways.

Scale and professional review

The ceiling brief calls for 11 feet 4 inches downstairs and 10 feet upstairs. Furniture, clearances and door movements help test the layout, but the concept must also be reconciled with the survey, required elevation, setbacks and structural design.

Explore the support spaces in more detail: laundry, linen and shared spaces, now with storage-capacity and open-door operating examples.

Expanded November 6: compare garage width, vehicle footprints and side storage →

Expanded November 4: test pool-bath routes and a second entrance →

Trace garage arrival, pantry storage and outdoor serving →

Expanded November 5: compare ceiling targets and finished-floor levels →

All project notes →

For a more detailed scope review: Build a bathroom selection schedule around the five suites and pool bath.

Continue the site review: Compare the garages and driveway with the tree survey and construction access.

Review the main-level office: Test desk placement, doorway privacy and household routes before finishes.

Continue the upstairs review: Compare boxed, assembled and folded equipment dimensions for the upstairs gym.

Continue the door review: Compare the pocket frame and wall space before removing a door swing.

Continue the appliance review: Connect the selected model, cabinet drawing and authorization before fabrication.